ECHO Academy, Tiffin, Iowa.

Web Abstract: 
Describes this alternative high school that features a geothermal well field for heating and cooling, a wetlands septic system, and landscape plantings grown by the students. Building statistics, a listing of the design and construction participants, cost details, a floor plan and photographs are included.
Journal: 
Design Cost Data
Publication Date: 
10/31/2005
Page Numbers: 
34,35
Resource List Category: 
References to Journal Articles